image_not_found
01

Software Development Methodology

We apply SDLC (Software Development Life Cycle), so once you have started a project with us, the next steps are quite simple.

image_not_found
02

Defining the project scope

Upon the submission of the Request for Quote, Norak Technologies Ltd assigns a team to gather and analyze the requirements and create vision/scope documents. The team prepares functional specifications, design, detailed plans for sprints/iterations and delivery, as well as cost estimates.

image_not_found
03

Development

The development process starts off with creating Technical Design Documents (TDD), Project Plans and Test Plans. Norak Technologies Ltd builds a software prototype to simulate the future application and receive feedback from the customer. When all the features are implemented and integrated according to the requirements, the team performs development testing and comes up with a user guide.

image_not_found
04

Stabilization

In this stage, the solution undergoes a full cycle of testing with bug fixing to ensure that software is running like clockwork.

image_not_found
05

Project delivery

Upon the delivery of the project, you receive:

  • Software product
  • User manual
  • Installation and maintenance instructions
  • Source code
  • Technical requirements
  • Design
  • Setup program
  • Warranty
Both the chat and Whatsapp is here with comment.